The Afcons-SMC JV was awarded the Package III of the Extension of the Lake Victoria Pipeline Water Supply Project to Tabora, Nzega and Igunga towns by the Ministry of Water and Irrigation.
Key numbers
The Afcons-SMC JV is laying 602.29km of water pipeline as part of the project. The details are as follows:
MS pipes (900mm dia to 100mm dia): 131.65km
DI pipes (450mm dia to 250 mm dia): 33.13km
uPVC pipes (225mm dia to 63mm dia): 437.51km
Ground Service Reservoir (GSR) (2500 Cum to 100 Cum): 5
Elevated Service Reservoir (ESR) (500 Cum to 80 Cum): 5
Water kiosks: 303